Last additions
|
89 viewsLeft carb cover.Apr 18, 2014
|
|
86 viewsRight carb coverApr 18, 2014
|
|
88 viewsRemoving vacuum lineApr 18, 2014
|
|
89 viewsRadiator removed.Apr 18, 2014
|
|
88 viewsRadiator & cooling fan.Apr 18, 2014
|
|
89 viewsUnbolting radiatorApr 18, 2014
|
|
87 viewsUnbolting radiatorApr 18, 2014
|
|
92 viewsLoosening the hose clamps for lower radiator hose.Apr 18, 2014
|
|
92 viewsDraining coolant.Apr 18, 2014
|
|
87 viewsLeft engine guard.Apr 18, 2014
|
|
87 viewsLeft forward peg bolt. Pretty bent.Apr 18, 2014
|
|
89 viewsLeft forward peg.Apr 18, 2014
|
|
96 viewsTrip computer. The wiring harness connector seems stuck.Apr 18, 2014
|
|
90 viewsIgnition box vacuum line.Apr 18, 2014
|
|
86 viewsIgnition box wiring connecitonsApr 18, 2014
|
|
89 viewsWiring box model numbersApr 18, 2014
|
|
112 viewsBackside of the left side panel. There are some cracks, one of the pegs is missing, and one fell off right after this picture.Apr 16, 2014
|
|
106 viewsThe bike was originally a gold color, but has been painted blue and then orange.Apr 16, 2014
|
|
105 viewsAll the wiring in place.Apr 16, 2014
|
|
99 viewsI added some tape just to try to avoid any accidental groundings.Apr 16, 2014
|
|
98 viewsSome tape added to the battery terminal to prevent grounding.Apr 16, 2014
|
|
91 viewsHooked up and in place.Apr 16, 2014
|
|
91 viewsA zip tie will help to keep the wires connected. If this comes apart, the whole thing will shut down.Apr 16, 2014
|
|
90 viewsNew battery to solenoid cable built.Apr 16, 2014
|
|
91 viewsBoth cables connected.Apr 16, 2014
|
|
97 viewsStarter cable in place and fits perfectly.Apr 16, 2014
|
|
100 viewsNew lug installed on the starter cable and covered with heat shrink tubeApr 16, 2014
|
|
97 viewsThe new lug to be crimped on to the starter cable.Apr 16, 2014
|
|
97 viewsNew copper lugs.Apr 16, 2014
|
|
113 viewsTonight's project was to clean up this mess.Apr 16, 2014
|
|
4006 files on 134 page(s) |
|
3 | |
|
|
|
|
|
|
|
|